Projects

Projects let you track time, budgets and profitability for a client engagement or internal work. Each project gets a number such as PRJ-0001, counted per company, which you can type into the top-bar search to find it. The timer and My time follow the language you pick on My profile, English or Spanish.

The Projects list

The list has Active, Completed and Archived tabs, each with a count. Above the active projects, four figures sum them up: hours this week against last week, ready to bill (billable time not yet invoiced), invoiced, unpaid, and how many projects need attention.

Each project is a card showing:

  • Its number, billing type, client and end date.
  • Its health: On track, At risk (90% of the budget used, or on pace to pass it by the end date), Over budget, No budget, or Internal for non-billable work.
  • A bar of the budget used, the hours logged this week, and what is unbilled (or the fee, or the cost).
  • The margin, for admins and project leads.
  • The team's initials, and Timer running when your timer is on that project.

Creating a project

  1. Go to Projects and click New project.
  2. Enter a name and, if you like, a description, a client, and start and end dates.
  3. Choose how it is billed:
    • Hourly: time is billed at hours × rate. You can set a project rate used when the person and service have no rate of their own.
    • Fixed fee: one agreed fee. Logged time measures effort against it.
    • Non-billable: internal work. Time is tracked for cost and never billed.
  4. Set a budget in money or in hours (a fixed fee's budget is the fee).
  5. If you can edit projects, tick the project leads.
  6. Click Create project. The project opens with its number.

The project workspace

A project opens with Start timer, Log time and, when there is time to bill, Bill with the amount. Its tabs are:

  • Overview: budget used, hours logged (and this week), unbilled time with its oldest date, invoiced but unpaid, and, for admins and leads, profit and margin after cost. The budget burn chart shows spending week by week against the budget line, with a dashed forecast to the end date at the pace so far. The team panel lists each person's hours and bill rate.
  • Time: the time log, filtered by person and by status (not invoiced, invoiced, non-billable). Billed time shows its invoice number; select it to open the invoice at the line the entry is on.
  • Billing: the invoice builder, which turns unbilled time and project costs into a draft invoice (hourly projects).
  • Team & rates: who works on the project, and its rates.
  • Client portal: who at the client sees the project in the Partner Portal, and which time they see. Shown to admins, editors and the project's leads.
  • Settings: the project's details and billing, and its status. Needs the Projects edit permission.

How budget burn is counted

Burn is logged time at each person's cost rate (their bill rate when no cost rate is set), plus the project's approved bills and expenses. Draft bills don't count. On an hours budget, burn is the hours logged. Profit is what was invoiced (approved, sent or paid) less expenses and the cost of time, so it is only as complete as the cost rates people have; the Overview says how many hours have no cost rate.

Team and rates

On Team & rates, someone with the Projects edit permission adds people as Lead or Member and sets each person's bill rate and cost rate per hour. People who logged time without being on the team show at the bottom and can be added. Service rates set this project's rate for a service, in place of its catalog price. Rates by person set one person's own rate for one service on this project, for example a senior consultant's consulting rate. Click Save team and rates to keep the changes.

New time takes the first rate it finds, in this order: a rate typed on the entry, the person's rate for the service, the project's service rate, the person's bill rate on the project, the project rate, the service's catalog price, then your last rate on the project. Time already logged keeps its rate. Time with no rate found shows No rate yet; use Edit to set one. Time on a non-billable project is never billable.

Rates show per hour ("/hr"). An hourly project can Enable half-rate time: then starting a timer, logging time, editing time and the weekly grid offer Standard rate, Half rate (full hours at half the rate, rounded to the cent) and No charge. A rate typed on an entry is never halved. Time lists show a Half rate or No charge badge.

A project's profit and margin count everything so far: what was invoiced plus unbilled time at bill rates, less expenses and the cost of all time. Time logged before a person had a cost rate uses their current one.

When you save a new cost rate for someone on Team & rates, their time on the project that is not invoiced yet is re-costed at that rate, including time logged before the change, and clearing the rate clears it from that time too. Invoiced time keeps the cost it was billed with, and the time of people who leave the team keeps its cost. Half rate lowers only the bill rate; the cost is never halved. To correct time logged earlier, open Team & rates and save once.

Who sees what

Admins, anyone with the Projects edit permission, and the project's leads see everyone's time on a project, with who logged it, and see cost rates, profit and margin. Other members see only their own time, and the project's totals without cost or profit.

Sharing a project with the client

On the Client portal tab, someone with the Projects edit permission turns on Shared in the portal and ticks who at the client sees the project: the client's email and its Partner Portal contacts. Sees time says whether that person also sees the project's published time. Click Save sharing. The client sees the project's status, dates and budget, and only the time you publish; never your team's notes, costs, margins or other projects. Turning sharing off hides the project again, and moving the project to another client ends its sharing.

Under Time in the portal, write what the client should read for an entry and click Publish. The client sees the day, the person's first name and last initial, the service, the hours, the rate, the charge and your words. Editing the entry later changes nothing the client sees: the tab marks it Changed since it was published until you click Publish changes, and the earlier version is kept. Take off the portal withdraws it. Running timers can't be published. In Settings > Projects and time, Time clients can see in the portal is Any finished time (the default) or Approved time only, which needs time approval turned on.

The client marks each published entry Reviewed or asks a question about it in the portal. The tab counts what is left to review and shows each answer: who reviewed it and when, or the client's question, which also arrives in Messages for you to answer. If the time needs a change, edit it and publish again; the client then reviews the new version. Under the contacts, tick Client reviews time before it's invoiced and click Save sharing to make that client's shared time billable only once they marked it Reviewed and it hasn't changed since. The switch is off by default and belongs to the client, so it holds for all of their shared projects and no other client is affected. The Billing tab shows how many hours are waiting for the client, and reviewed time is billed at the rate the client saw. Projects that aren't shared bill as usual.

Automatically publish time to this client's portal (Client portal tab, off to start) publishes time logged after it is turned on, following your company's approval policy, using each entry's client-facing description; internal notes are never shown. Time without a client-facing description waits and is flagged. A publish that fails shows Try again. It turns itself off if the project's client or sharing changes, and it never approves, invoices or emails anything.

The timer

The timer lives in the top bar, so you can start or stop it from any page. Click Start timer, choose an active project, optionally the service you are working on and a note, and click Start. Your recent projects are one click away under Recent. While it runs, the top bar shows the time and the project; click Stop to finish the entry. A project's Start timer button starts it on that project.

You have one timer at a time: starting a timer stops the one that is running. Your company can round every stopped timer up to 6 or 15 minutes. Someone with the Org settings edit permission sets this in Settings > Projects and time; admins see a link to it on My time. The default is exact minutes.

My time

My time (in the menu under Projects) is your week on one screen. Each row is a project and service, and each column a day. Type hours straight into a cell, as 1.5 or 1:30, and press Enter or move on to save. Typing 0 removes that day's time. A running timer counts up live in its day.

  • A cell with invoiced time shows a lock and can't be changed. With approval on, submitted and approved time is locked too (see Time approval below).
  • A day with more than one entry for the same row is changed in the project's Time tab instead, so no entry is merged or lost.
  • Add project row adds a project and service to the week, and Copy last week's rows adds the rows you used last week.
  • Add time logs a block of time with a date, hours, a note and an optional Start time.
  • The side panel splits the week into billable, non-billable and invoiced time, and compares it with the four weeks before.

On a phone, My time shows a strip of the week's days and the chosen day's time as a list, with Add time below it.

Send your time to Toggl Track

Where your company has it turned on, My time → Toggl opens Send time to Toggl. Each person connects their own Toggl account with its API token (kept sealed, never shown again; disconnecting erases it) and picks a Toggl workspace and project for each RSA project. Paste the token as it appears on your Toggl profile page, including Toggl's newer tokens that start with toggl_sk_. Spaces, line breaks and invisible characters from copying are removed for you, and if Toggl does not accept the token you are told so; text that does not look like a Toggl token gets a message saying so. Mark your finished time Ready for Toggl with a description written for Toggl; notes, rates and costs are never sent. Each entry shows Not sent, Ready for Toggl, Sending, In Toggl, Needs review or Changed since sent, and RSA sends every 15 minutes or on Send now. Time with no start time goes to Toggl at 12:00 noon on its day, which you approve per entry. To send it at the time the work began instead, give the entry a start time, either when you add, log or edit the time or on the Toggl page, where each ticked entry can set or change its Recorded start; no noon approval is needed then. A start must fall on the entry's work date. Time logged before you connected shows as Earlier time to review and is sent only after you approve it. A weekly deadline (Friday by default) and a reminder on My time count every entry of the week as In Toggl, Waiting to send, Needs you or Can't be sent, and Check against Toggl compares a week with your Toggl account without changing anything.

The week summary takes the latest check into account. An entry the check found deleted in Toggl, or different in Toggl, is listed under Needs you (as "deleted in Toggl" or "different in Toggl") instead of In Toggl, and the My time reminder shows. "All entries are in Toggl" appears only when a check made after every send confirmed each entry. Otherwise the summary says the entries were sent and when they were last checked, or that no check has run yet. A check that fails changes nothing. Neither the summary nor the check sends, resends or deletes anything.

A check only looks at the Toggl account you have connected now. If you connect a different Toggl account, time you sent earlier to the previous account shows as sent but not confirmed until a check of that account, and it is never counted as verified by a check of the new one. A check saved before this change confirms nothing until you run Check against Toggl for that week again.

RSA never deletes or re-creates Toggl entries by itself. If Check against Toggl finds that an entry you sent was deleted in Toggl, the entry shows Deleted in Toggl with a Send again button. RSA first confirms with Toggl that the entry is really gone, so an entry you only moved to another day or project in Toggl is never sent twice. Send again then queues the time as a new entry with the description it was sent with. Once you send it again, the old "deleted" result no longer applies to that entry, so Send again is not offered a second time, and the check result says how many entries were sent after it.

If the Toggl project has tasks, a project's Toggl destination can have a default task, chosen from that Toggl project's active tasks (the field is hidden when it has none). Time goes to that task unless you pick another task, or no task, for an entry on the Toggl page before marking it Ready for Toggl. Archived tasks and tasks from another Toggl project are refused. If you change an entry's task after it was sent, the same Toggl entry is updated, and removing the task clears it in Toggl. Changing the default task does not change time that is already queued.

Time approval

Approval is optional and off to start with. Someone who can edit organization settings turns it on with Require approval in Settings > Projects and time. While it is on:

  • My time shows an Approval panel with how much of the week is not submitted, waiting for approval, approved or sent back. Submit week sends your finished time for that week. Time you add later, or time that was sent back, is submitted the same way.
  • Submitted time shows a lock and approved time a check mark. Neither can be changed or deleted until an approver sends it back.
  • Admins, anyone who can edit projects, and a project's leads see Approvals at the top of My time. The Time approvals page lists submitted time by person and week. Tick entries, or a whole week, and click Approve, or Send back with a reason. The person sees the reason in their Approval panel. Leads decide only on the projects they lead, and nobody approves their own time.
  • Only approved time can be invoiced. The Billing tab says how much billable time is still waiting for approval, and the project's Time tab shows each entry's status.

Time logged before approval was turned on has to be submitted and approved too before it can be billed.

Logging time on a project

On a project, click Log time and enter a date, the hours (1.5 or 1:30), an optional service and description, an optional Start time, and whether it is billable. If the time will go to Toggl, a start time sends it at that time instead of 12:00 noon; leave it empty to keep the noon default. On an hourly project you can type a rate; leave it empty to use the project's rate rules.

Fixing or removing time

Each entry on the Time tab has Edit and Delete. Edit changes the date, hours, an optional Start time, rate, description and whether the entry is billable. For time from a timer, Edit also shows when the timer started and lets you change it. You can always change your own time; changing or deleting someone else's needs the Projects edit or delete permission.

Time that is already on an invoice shows Locked and can't be changed or deleted, so the invoice and the time log always agree. To change billed time, delete the draft invoice or void the invoice; that frees the time again.

Billing time and costs

On an hourly project, the Billing tab is the invoice builder. On the left, Ready to bill groups billable time that isn't on an invoice yet into invoice lines: hours × rate. Choose Group lines by Service (one line per service, the usual choice), Person (one line per person) or Entry (one line per time entry), and pick the date to bill up to. Time billed at two different rates gets two lines. Tick the lines to include; everything ready is ticked to start with.

Below, Project costs to pass on lists the project's expenses and approved bills that haven't been billed to the client yet. Tick the ones the client pays back; they go on the invoice at cost as Reimbursable lines. Only admins and project leads see this list.

On the right, the draft invoice preview shows exactly what will be created: the client and their payment terms, every line, the due date (from the client's terms; change it if you need to), a sales tax percentage for the lines, and the total. Two warnings can appear before you bill:

  • Different rate: some time was logged at a rate the project no longer uses (a person's or a service's rate changed since). Choose Keep logged rates or Use current rates; the entries take the rate you bill. A rate typed by hand is never flagged.
  • No rate: some time has no rate and would bill at zero. Set rates opens Team & rates.

Click Create draft invoice. RSA creates a draft invoice for the project's client with those lines and links to it, so you can review it, approve it and send it as usual. The billed time is locked and the passed-on costs aren't offered again. If someone else billed the same time a moment earlier, nothing is created and you're asked to reload. The project needs a client first; set one on the Settings tab. Fixed-fee projects bill the fee from Invoices, and non-billable projects are never invoiced.

On the invoice, each line built from time has a short link, such as 2 time entries · 7:00 h, that opens the entries in a window of their own, so the line stays one line. The window shows each entry's note, the project number and name, and the day, person, service and hours, and each entry links to its row on the project's Time tab; project leads and people who can edit projects see this. While the invoice is a draft you can change a line's words, hours or price and it keeps its time. Removing a line frees the time on it. Invoices billed before RSA 3.70.0 show only a total of their time.

Deleting a draft invoice, or voiding an invoice, frees its time and costs, and they show up on the Billing tab again.

Already invoiced? Time you invoiced another way (an invoice typed by hand, or one entered as history) still shows as not billed until you link it. On the Billing tab, the Already invoiced? card lets you pick one of the client's approved, sent or paid invoices (and, if you like, one of its lines) and the time it covers; that time is then marked as billed on that invoice. The invoice and its amounts don't change, and voiding the invoice frees the time as usual. The client sees the time as billed in the Partner Portal too.

Completing and archiving

On the Settings tab, Mark completed moves a finished project to the Completed tab, and Reopen brings it back. Archive hides a project from the Projects list and from the project picker on invoices, and stops new time being logged on it; open the Archived tab on Projects to find it and click Restore. These need the Projects edit permission.